Skip to Main Content

Architectural Documentation Collection

Architecture and Computer Building Documentation (Now Engineering Center, Computer Center)

Architecture and Computer 1 [Collection # AD_0206.01]

  • 1964 Basement and First Floor
  • Screen Room, Room 110
  • 1960 Bronze Tablets, Revisions to 1st Floor, Foundation Plan, Revised Electrical Fixture, Elevations, Stair #4, Revised lobby, wall sections
  • 1965 Shelving And Storage Units Dept. Of Architecture & Allied Arts
  • 1959 Elevations, 2nd and 3rd Floor
  • Elevation Drawing, Courtyard Perspective, Basement, 1st, 2nd, 3rd Floor Plan
  • 1959 Nuclear Reactor Building, Plot Plan, Ground Floor Plan
  • 1958 Storage Units For Freehand Labs Architecture & Allied Arts Department
  • Storage Units For Drawing Boards
  • 1959 Alternate Plan for Computer Center
  • 1958 Storage Units for Free & Design Lab
  • 1964 Metal Base for Drafting Tables, Side Storage Units for Drawing Tables
  • 1957 Library Usage
  • 1960 Elevation, Foundation Plan, Stair #4, 
  • 1964 Basement
  • 1972 Rehabilitation of the [Former] Architecture Building
  • Galv Iron Clay Box
  • 1955 Drafting Tables
  • Color Selections
  • 1984 Computer Center Phase 2
    • Title Page
    • A 1-7
    • M 1-3
    • E 1-3

Architecture Computer - ARCH-COMP 2. 0206 [Collection # AD_0206.02]

  • 1959 Sheets 1-27 Elevations, Sections, Framing Plan, Foundation Plan, Basement Plan, 1st Floor, 2nd Floor, Roof, Column & Footing, Beam, Details, Alternate Plans, Elevations, Door, Window, Plumbing, Electrical, Mechanical
  • Rehabilitation of the Former Architecture BLDG.
  • 1st Floor Plan Part A, B, 2nd Floor Plan, Third Floor Plan
  • 1960 Revisions to 1st Floor, wall Sections with Stool heights, Revised Opening from Lobby 140-A to Room 103, Revised Electrical Fixture

Chemical and Nuclear Engineering Documentation (Now Engineering and Technology Labs)

Chem Eng 1 [Collection # AD_0207.01]

  • 1979 Schema A, B, C
  • 1964 Floor Plan
  • 1968 Remodeling of Room 105
  • Manual 
  • 1961 Layout and Roughing-In, Notes, Fuel and Combustion Lab #104, Analytical Laboratory #110, Research Laboratory #202, 213, Preparation Room #212A, Plans, Sections, Details, Process Instrumentation Lab
  • Floor Plans, Site Plans, Cover Page, Sections, 
  • Nuclear Reactor, Plan View, Elevation, Sections, Diagram, Schematics

 

Chem Eng 2 0207 [Collection # AD_0207.02]

  • Copy of Nuclear Reactor Chemical Engineering 1960 Stiles, Roberts & Messersmith - McMurty & Craig - Schmidt & Stuart (A. I. A.)
    • 1-28
    • M1-16
    • ATL 1-2
  • No Date: Stair Details
  • May, June, July, and August 1959 versions of plans
    • Potential Alternate
    • Ground Floor Plan
    • First Floor Plan
    • Second Floor Plan
    • Basement Floor Plan
    • Elevations

Nuclear Reactor Chemical Engineering 1960 Stiles, Roberts & Messersmith - McMurty & Craig - Schmidt & Stuart (A. I. A.) [Collection # AD_0210.01]

  • Cover
  • Plot Plan
  • Foundation Plan and Details
  • Framing Plan, Roof Framing, Framing Details
  • Basement, First Floor, Second Floor Plans
  • Finish Schedules
  • Exterior Elevations
  • Roof Plan & Cross Sections
  • Wall Sections
  • Stair & Elevator Details, Stair Details
  • Reactor Support Details
  • Hot Cell Details
  • Toilet & Locker Room Details
  • Millwork and Interior Details
  • Reflected Ceiling Plans
  • Door and Window Details
  • ATL1-2 Plot Plan Mechanical & Electric Basement Plumbing
  • M1-16 Plumbing Details, HVAC, Lab Equipment Details, Electrical Plans, Alternate No. 1 and No. 2

Engineering Technology Lab [Collection # AD_0210.02]

  • 1994 Adling Associates Replace Roof 
    • A1-3 Roof Plan and Parapet Detail

Petroleum Engineering

Petroleum Engineering - As Built plans (1981-2) of the 1950 building [Collection # AD_0016.01]

  • F0-F5 Fire Protection: Overall, Ground Floor, Second Floor, West and East, and Alternate Floor Plans
  • H0-110 HVAC Plans: Overall, Ground Floor Second Floor, West and East, Mechanical Room Details, Schematics, Diagrams and Schedules, Alternate Floor Plans, Building Plan
  • E00-E12 Electrical and Lighting: Overall, Ground Floor, One Line Diagram, West and East, Schedules, Alternates
  • P00-6 Plumbing: Ground Floor, Second Floor, West and East, Toilet Schematics and Details, Alternates
  • 1-5 Automatic Sprinkler System
  • Architectural Plans
    • Title and Index
    • Overall Ground Floor
    • Overall Second Floor
    • Ground Floor, West and East
    • Second Floor, West and East
    • Alternate Floor Plan
    • Reflected Ceiling Plan (Ground Floor and Second Floor West and East)
    • Interior Elevations
    • Roof Plan, Alternate Roof Plans
    • Elevations and Details, Alternate Elevations
    • Stair Plan and Details, Alternate Stair Plan and Sections
    • Elevators Sections and Details
    • Wall Sections and Details
    • Details
    • Door and Window Schedule
    • Gate Elevation, Roof Hatch Detail
    • Classroom 114, 125, 126, 128
  • Structural Plans
    • Notes and Schedule
    • Foundation
    • Ground Floor, Second Floor, Roof Framing Plan
    • Alt No1, 2, and 3 Plan and Details
    • Foundation Details
    • Steel Details, Splice Detail, Ramp Slide, Ramp Connection
    • Sections
    • Alt No. 1 Details
  • Storm Water Plans
    • Paving Plan (Grading)
    • Site Plan Alternates 1 and 2
    • Test Boring Data
  • Details
    • Partition, Labs, Beam Section, Paving for Dumpster Access
    • Fascia, Flashing, Opening, Elevations
    • Typical Interior
    • Plan North, Lateral Brace, Base
    • Handrail
    • Enlarged Plan, Pre-Cast Concrete Canopy