Welcome back to campus from the University Libraries.
We are going through some construction on the 5th floor, where the engineering collection had been located. Many of these items are now available either on the 4th floor, or are in storage in our Annex.
The moveable shelves have been removed and the carpet removed. Contractors are working to get the rest of the equipment from the tracks for those shelving units out of the cement.
We ask that all persons visiting the library stay away from the 5th floor as it cannot be used as a study space until the flooring has been replaced, which might be by spring 2023.

0 Comments.